HOME
TRAINING
RANGES
MANEUVER
ITAM
ENGINEER OPS
FISHING
HUNTING
MWR
CSS
WATERBORNE OPS
NEXT IMAGE

FLOATING BRIDGE AND WATER PURIFICATION TRAINING IS CONDUCTED AT THIS SITE.
THE FLOATING BRIDGE SITE IN MANEUVER AREA 11 HAS CABLE CONCRETE REVETMENTS ALONG THE BANKS
TO REINFORCE THE SHORELINE AND PREVENT EROSION.
FORT PICKETT ALSO HAS NUMEROUS OTHER BRIDGE TRAINING SITES, INCLUDING A LIVE FIRE ENGINEER BREACH LANE.